LT-MASTER SETUP & PREPARATION One of the features that lets the LT-Master stand out is its short setup time of approx. three minutes. This is a feature of no great importance especially for professional contract harvesters who often need to change locations several times a day. Setting up the machine is an entirely hydraulic process. The LT-Master is ready for use after only a few simple steps. 1 2 3 Correct position of the LT-Master with the drawbar swiveled out Extending the support feet Lowering the feeder 4 5 6 Folding down the panels of the sloping conveyor and the feeder Folding down the bale ramp The LT-Master is ready for use within three minutes! 12
1 2 IMAGE DESCRIPTION 1) Quick change of the wrapping film 2) Effortless replacement of net or wide film 3) Adjustment of the program settings to the material 4) Check the grease supply of the machine 5) Check the oil supply of the machine 3 4 PREPARING THE MACHINE What is more, other usually time-consuming steps can be completed in a swift and straightforward fashion thanks to optimized details such as the following: • Replacing the wrapping film takes no time at all thanks to the quick-release fastener. • Replacing the net or the wide film requires only a few simple steps. • The program control “PROFI” allows the operator to fine-tune the machine perfectly to the material at hand. A decisive advantage: the menus can be navigated in nine different languages. • Refilling the central lubricator with grease (8 l) and oil (16 l) is effortless. 5 13
Laden...
Laden...
Laden...